Project Eligibility

CDC vs DA vs SSD — which pathway is right for your project.

Tasks

  1. Identify NCC classification (Class 1a, 1b, 2, 10a etc.)
  2. Check CDC eligibility against State Environmental Planning Policy
  3. Calculate proposed GFA / FSR against LEP maximum
  4. Calculate proposed height against LEP maximum
  5. Confirm proposed setbacks against DCP minimums
  6. Identify any variations required (Clause 4.6 candidates)
  7. Confirm minimum lot size against LEP if subdividing
  8. Check if Heritage Impact Statement is required
  9. Determine pathway: CDC vs DA vs SSD