Torrens Title Subdivision

Splitting one lot into 2+ Torrens title lots (each freehold, separate title).

A$15,000–80,000 build cost8–26 weeks DA timeline

Typical pathway by state

NSW: DA + Subdivision Certificate via Council or Registered Certifier
VIC: Planning Permit under Cl 56 (Residential Subdivision) + Plan of Subdivision
QLD: Reconfiguring a Lot (ROL) + Plan Sealing

Required documents

  • ✓Site Survey
  • ✓Subdivision Plan (Plan of Subdivision)
  • ✓Stormwater + servicing diagrams
  • ✓Cadastral / boundary survey
  • ✓Section 88B Instrument (NSW — easements, restrictions)
  • ✓Title search + dealing search

Optional / triggered docs

  • •Bushfire risk assessment (BAL on new lot)
  • •Flood assessment per lot
  • •Geotechnical (if non-standard soil)
  • •Acoustic (if near road/rail)
  • •Heritage IS
  • •Native vegetation report

Typical consultants

Key compliance checks

  • ▸Minimum lot size (typically 400-600m² in metro residential)
  • ▸Minimum frontage
  • ▸Minimum lot dimension/depth
  • ▸Battle-axe lot rules + handle dimensions
  • ▸Servicing — sewer, water, power, NBN, stormwater per lot
  • ▸Drainage easements + Section 88B restrictions
  • ▸Right-of-carriageway for shared access
  • ▸Heritage / character impact on subdivision pattern
Notes

Torrens subdivision creates separate fee-simple titles — preferred for sale or refinance. Section 88B in NSW is the instrument that creates easements + restrictions on title. Subdivision Certificate is separate from DA — issued by Council or Registered Certifier after works complete.